|
Post by Sherford on Oct 19, 2009 14:28:57 GMT
GreenPrint for Sherford development, South Hams www.bre.co.uk/page.jsp?id=1291Key elements of the masterplan Two wind turbines within the 200 ha Community Park contributing to the overall 50% renewable electricity requirement. 80% of the roof area of the whole development used for rainwater harvesting. 75% of buildings will be equipped with solar thermal systems and/or photovoltaic devices. All dwellings to be built to the EcoHomes Excellent standard (equivalent to CSH level 3/4). Transport and movement strategy places the pedestrian and cyclist at the heart of the development, minimising walking distances between home, workplace, schools and shops. Increase in jobs and local skills base, and training opportunities to help local workers up-skill.
|
|